2023

In Nov. 2023, 2.2 MW axial flow reaction ORC independently developed was put into operation. In July 2023, 1.6MW low-parameter corrosion-resistant stainless steel ST independently developed.


Release time:

2024-08-02

In July 2023, 1.6MW low-parameter corrosion-resistant stainless steel ST independently developed.
In Nov. 2023, 2.2 MW axial flow reaction ORC independently developed was put into operation.

Key words:


Previous article

Next

Previous:

Next: